Bodywork business
Front floor
Release time:2025-12-12 |Author:admin |Reading:4395Times
Year: 2017
Product: Front floor of a certain car model
Cycle time: 55 JPH (65s)
Process: Spot welding, glue application, stud welding, arc welding
Robots: 28 units
Features: Wide range of process applications, high system integration, flexible switching between multiple car models, and greatly reduced labor input; the entire production line only requires 10 people.
Product: Front floor of a certain car model
Cycle time: 55 JPH (65s)
Process: Spot welding, glue application, stud welding, arc welding
Robots: 28 units
Features: Wide range of process applications, high system integration, flexible switching between multiple car models, and greatly reduced labor input; the entire production line only requires 10 people.



上一篇:skylight
下一篇:Four-door piping


400-1016-959
Map